-
Material Processing
Facilities – Zinc plating facility with
a capacity of 8 tonnes daily.
-
Paint Booth – Capable of handling both LCV’s and HCV’s.
-
Quality Control equipments for the inspection of incoming material and in-process quality
control.\
-
Mig Welding machines – Added more for capacity and eliminated arc welding from
the process.
-
Shower Testing facility to suit LCVs as well as MCVs.
-
Jigs, Tools and Dies have been developed for standardizing, maintaining quality and
achieving higher productivity.
-
Material Handling
Equipment, such as gantry and lift for
mounting dummy body on to the chassis has been added. Equipment
for handling windows, wheels, in-process material, etc.
-
Shell-Dropping system - have achieved partial shell dropping
system.
-
In-house Tool Room facility for preparing tools, jigs and dies.
-
350 Tons Heavy Duty Press enables us to increase efficiency and
improve quality.